White Raven raven logo White RavenTransportation Taking load requests · 18 states Request a quote

Home / Oil field equipment

// Oil field hauling

Hot shot oil field hauling.

Hot shot trucking started in the oil patch, running parts to rigs the minute they were ready. We still do that: tanks, pipe, valves, pumps and the part that is holding up the job.

Two stainless steel tanks loaded on the White Raven RawMaxx gooseneck flatbed
Steel tanks
40ftGooseneck deck
12,000lbMax load
18statesService area
LiveGPS tracking

// What we haul

From the shop to the site.

Equipment and parts up to 12,000 lb and 40 ft long.*

Tanks and vessels
Drill pipe and tubing
Valves and wellhead parts
Pumps and motors
Hot parts for down equipment
Generators and light towers

*We do not haul hazardous materials.

// Why White Raven

Built for down time.

01

One truck, one load

When a rig or pump is down, a dedicated truck goes straight from the shop or yard to the site. No waiting on a full trailer.

02

Lease roads and pad sites

A pickup and gooseneck handle rough roads and tight pads a big rig struggles with.

03

Secured and covered

Chains, binders, straps, edge protectors and tarps, plus a 12,500 lb winch for awkward pieces.

04

Live tracking

Motive ELD plus Macropoint and Trucker Tools, so the site knows when the part lands.

// Real loads

Our trucks. Real freight.

No stock photos. These are White Raven loads.

Steel pipe and fittings strapped on the gooseneck deck
Pipe and fittings
Heavy equipment parts chained to the deck at an equipment yard
Heavy parts, yard pickup
Load tarped and strapped on the gooseneck trailer
Tarped and strapped

// Lanes

Where we run it.

Texas, Oklahoma and Louisiana are home turf: Houston, Dallas, San Antonio, Oklahoma City and New Orleans, plus 15 more states across the Midwest, South and Southeast.

See all 18 states

// FAQ

Straight answers.

Do you haul to rigs and well sites?

Yes. Pickup at the shop or yard, straight to the rig or pad site, with one driver the whole way.

Do you haul hazmat?

No. We haul oil field equipment and parts, not hazardous materials.

How fast can you get a part to a site?

We plan best with a day's notice. Same-day pickup depends on truck availability. Call (801) 722-8046 for a straight answer.

How much can you haul?

Up to 12,000 lb on a 40 ft by 8.5 ft gooseneck deck. Send the weight and dimensions and we will confirm before you book.

Also hauling: Steel hauling, Construction equipment, Construction vehicles, Car and truck hauling, RV and trailer hauling, Motorsports hauling, Farm equipment, Expedited freight, Partial flatbed loads, Flatbed freight, Regular shipments

Rig down? Part ready? Request a quote.

Request a quote